JSC Group were engaged to deliver a range of upgrades to walkways around The Queanbeyan Performing Arts Centre along with the construction of a new carpark for the building. Footpath works encompassed excavation, flexible pavement insulation, in-situ concrete walls, and concrete slab installation. Carpark construction works revolved around line marking, street lighting, curb and gutter, footpath works, electrical vehicle charging, traffic control, and street sign installation